Skip to content
Demaine
  • Home
  • Architecture
    • Apartments
    • Houses
    • Recreation
    • Retirement
    • Aged Care
    • Education
    • Commercial+Retail
  • Interiors
    • Classic
    • Contemporary
  • Urban Design
  • Sustainability
  • About Us
    • About Us
    • Profile and Team
    • Process
  • Contact Us
  • Home
  • Architecture
    • Apartments
    • Houses
    • Recreation
    • Retirement
    • Aged Care
    • Education
    • Commercial+Retail
  • Interiors
    • Classic
    • Contemporary
  • Urban Design
  • Sustainability
  • About Us
    • About Us
    • Profile and Team
    • Process
  • Contact Us

Architecture / Education / RMIT Printing Building

RMIT_JWA_02
RMIT_JWA_09
precast
corridor
curtain-wall
RMIT_JWA_03
entrynight
RMIT_JWA_07
entrynight_2
RMIT_JWA_02 RMIT_JWA_09 precast corridor curtain-wall RMIT_JWA_03 entrynight RMIT_JWA_07 entrynight_2

RMIT Printing Building

The RMIT Printing facility at Brunswick is a 3,000 sqm academic and technical facility for the faculty of art, design and communication. The initial client brief to retain, restore and add to an existing two storey brick building on the site . However careful analysis showed that the cost of achieving the demanding technical requirements of the brief within the existing building envelope brief exceeded the cost of a new building. What was initially envisaged as a refurbishment became a new purpose built facility for printing training at no additional cost. The cost effectiveness of the solution was reflected in the $1,040/m2 building construction cost. The building embodies careful consideration of thermal loads, utilizing motorized blinds to control solar gain and using the sloping clear glazing to generate convective ventilation effects. A concrete and steel framed structure is faced with carefully selected cladding materials, including tinted and clear framed and planar glazing systems, white quartz precast concrete panels and standing seamed steel sheet .

Principal Consultants

Demaine Partnership with John Wardle Architects

Client

RMIT University

Building Type

Teaching facilities, printing facilities

Time to complete

9 monthsÂ